Kogan turbine

Outages

CS Energy operates and maintains our assets to ensure they are available to provide affordable, reliable and sustainable electricity for Queenslanders.

We carry out regular planned outages to perform statutory maintenance and overhauls of our generating units.

Unplanned outages can occur from time to time, and when this occurs, our priority is carrying out the repairs safely, while also working to minimise plant downtime wherever possible.

power plant status

UnitStatusDetails
Kogan CreekOnline
Callide B1Online
Callide B2Online
Callide C3Online
Callide C4Online
Chinchilla BatteryOnline
Greenbank BatteryOnline
Last updated Wednesday, 25 November 2026 06:55 PM

Kogan Creek: potential protected industrial action

CS Energy has received notices of protected industrial action at Kogan Creek Power Station in connection with negotiations for a new enterprise agreement.

The notices received to date include actions that may temporarily affect the output or operation of Kogan Creek Power Station.

CS Energy respects the right of employees to take protected industrial action and has contingency arrangements in place to manage notified action, with the safety of our people and plant remaining our first priority.

Current notified protected industrial action

Date / time Notified action Potential operational impact
19 November to 3 December 2026,

daytime periods

10:30am to 2:30pm

Ban on operating below 720 MW or maximum available capability
Will limit CS Energy's ability to reduce generation from the unit
19 November to 4 December 2026,

overnight / peak periods

5:00pm to 8:00am

Ban on exceeding 320 MW Will reduce generation from the unit during the notified periods
19 November to 3 December 2026 Ban on returning the unit to service following a unit trip If the unit trips during the notified period, its return to service will be delayed
 23 to 30 November 2026 Ban on technical completion of work orders in SAP Will delay the close-out of completed work orders and maintenance records in SAP
 23 to 30 November 2026 Ban on commencing or accepting direction to perform tasks other than "face to face" Task allocation will need to be done face to face, which will slow work direction and response times
 23 to 30 November 2026 Ban on employees signing RPEQ certification (electronic or hard copy) for engineering approvals Will delay engineering approvals that require RPEQ sign-off
 23 to 30 November 2026 Ban on working with or providing instruction to contractors Will affect contractor-supported maintenance and project work on site
23 to 30 November 2026  Ban on use or operation of any or all cranes on site, unless in an emergency  Will delay lifting activities and maintenance work that relies on cranes
This page will be updated if further notices of protected industrial action are received, or if there are material changes to the notified action.

 

Future outages

The table below shows future planned outages for the next two calendar years.

Asset Outage type Start date End date
 Callide Unit B1 Planned outage - dual outage, precipitators 30 March 2027 29 April 2027
 Callide Unit B2 Planned outage - dual outage, precipitators 31 March 2027 30 April 2027
Callide Unit B2 Planned outage - major overhaul 10 September 2027 5 November 2027
Kogan Creek Planned outage - minor overhaul  7 April 2028 28 April 2028
Callide C3  Planned outage - minor overhaul and control system upgrade 21 April 2028  21 July 2028 
Callide C4   Planned outage -minor overhaul and control system upgrade 8 September 2028 8 December 2028

About this page

 

The content on this page is consistent with information available via the Australian Energy Market Operator (AEMO).

Under the National Electricity Rules (Clause 3.7.2), CS Energy must keep AEMO informed of our current intentions and best estimates for the availability of our generating units. 

Page last updated: Monday, 23 November 2026 3:23:36 PM